Virar-alibaug Multimodal Corridor Pdf [better] Direct

The Virar-Alibaug Multimodal Corridor (VAMMC) is a 126 km infrastructure project in the Mumbai Metropolitan Region designed to connect Palghar, Thane, and Raigad districts. Managed by the MSRDC, the project integrates an 8-to-14-lane expressway, metro line, and BRT system, with completion targeted for 2030 at an estimated cost of ₹55,000 crore. Key project documents, including technical terms of reference and environmental clearance reports, are available from the Ministry of Environment & Forests Virar-Alibaug Multimodal Corridor Overview | PDF - Scribd

Virar-Alibaug Multimodal Corridor (VAMMC) is a 126 km long, high-speed integrated transport lifeline designed to decongest Mumbai and link the satellite cities of the Mumbai Metropolitan Region (MMR). Spearheaded by the Maharashtra State Road Development Corporation (MSRDC)

, this ₹60,000 crore project combines road, rail, and utility networks in a single 99-meter-wide Right of Way. housing.com 🛣️ Key Project Specifications

The corridor is more than just a highway; it is a "multimodal" framework designed for massive urban growth. marathon.in Total Length: Design Speed: Expressway: 8 to 14 access-controlled lanes. Public Transit:

Dedicated tracks for Metro rail and Bus Rapid Transit (BRT). Utilities: Integrated pipelines for water, sewage, and gas. Right of Way (RoW): virar-alibaug multimodal corridor pdf

Typically 99 meters, expanding up to 126 meters in specific zones. housing.com 🗺️ Route & Phase Details

The project is divided into two major phases to streamline land acquisition and construction. MagicBricks Virar Alibaug Multimodal Corridor: Fact guide - Housing

The Virar-Alibaug Multimodal Corridor (VAMMC) is one of the most ambitious infrastructure projects currently underway in the Mumbai Metropolitan Region (MMR). Designed to transform regional connectivity, this 126-kilometer access-controlled expressway aims to link the northern suburb of Virar in Palghar district with the coastal town of Alibaug in Raigad district.

This project is not just a road; it is a "multimodal" corridor integrating highways, metro lines, and dedicated freight lanes within a single 99-meter right-of-way. Project Overview and Technical Specifications The Virar-Alibaug Multimodal Corridor (VAMMC) is a 126

Managed by the Maharashtra State Road Development Corporation (MSRDC), the corridor is engineered to support speeds of up to 120 km/h, effectively cutting travel time between Virar and Alibaug by 50%—from several hours to approximately 90 minutes. Total Length: 126 km. Lanes: 8 to 14 lanes depending on the stretch. Phases:

Phase 1: 96.41 km from Navghar (Virar) to Balavali (near Pen). Phase 2: 29.9 km from Balavali to Alibaug.

Key Infrastructure: Includes 30 major bridges, 28 flyovers, and a 4.75 km tunnel.

Total Estimated Cost: Approximately ₹55,000 to ₹63,618 crore. Strategic Connectivity and Economic Growth Suggested figures and tables (for PDF)

The VAMMC acts as a "middle ring road" for the MMR, connecting several existing and planned mega-projects:

Virar Alibaug Multimodal Corridor: Route & Status (2026) ​


Suggested figures and tables (for PDF)

The Multimodal Aspect

The term "Multimodal" defines the project's core philosophy. It integrates various modes of transport to ensure efficiency:

8. Phasing & implementation schedule (Gantt-style summary)